Transgrid has recently published Project Assessment Conclusion Reports (PACRs) – the final step in applying the regulatory investment test for transmission (RIT-T) – for three projects to maintain grid stability in NSW regions:
Our HoustonKemp team – Ann, Tom, Tony and Liam – were pleased to assist Transgrid in the preparation of these PACRs and throughout each of the RIT-T processes.
Alongside the major electricity transmission investment outlined in AEMO’s recent Integrated System Plan, these regional investments are a crucial part of the energy transition, helping to facilitate increased renewable energy build and demand growth throughout NSW. Our role in these projects was to assist Transgrid in preparing a thorough and transparent analysis of network and non-network options to address the identified need in each region.
In this video, Adrian and Sarah discuss an empirical technique known as an event study. In particular, they…
Adrian and Zoe had the privilege of attending the Harding Miller Education Foundation awards night at the…
Adrian has been working closely with IPART to redesign the regulatory framework applying to…
In this video Adrian and Dale explain how economic theory can help infrastructure businesses…